Software validation checks whether the software meets the requirements and expectations of the customer.
| List-I | List-II |
| A. Verification | I. White box Testing |
| B. Validation | II. Black box Testing |
| C. Internal logic exercise | III. Quality Control |
| D. Software requirement exercise | IV. Quality Assurance |
Verification → Quality Assurance → IV
Validation → Quality Control → III
Internal logic exercise → White box testing → I
Software requirement exercise → Black box testing → II
Matching:
A → IV
B → III
C → I
D → II
Cost Performance Index is calculated as:
$CPI = \frac{BCWP}{ACWP}$
That means:
Budgeted cost of work performed ÷ Actual cost of work performed
Number of transactions per second:
$ \frac{20000}{120} = 166.67 $
Size of each article:
$3k$ bytes $= 3000$ bytes
$3000$ bytes $= 3000 \times 8 = 24000$ bits
Throughput:
$166.67 \times 24000 = 4000000$ bits per second
$= 4$ megabits per second
| LIST I | LIST II |
| A. Scenario testing | I. To verify the I/O behavior of text object |
| B. Regression testing | II. User acceptance methodology |
| C. Component testing | III. No new bugs after changes in program |
| D. Beta testing | IV. The documentation of a use case |
Choose the correct answer from the options given below:
| LIST I | LIST II |
| A. PERT | I. Used for non repetitive jobs |
| B. Optimistic time | II. Used for repetitive jobs |
| C. CPM | III. The shortest possible time to complete the activity if all goes well |
| D. Pessimistic time | IV. The longest time that an activity takes |
Choose the correct answer from the options given below:
PERT is used for non repetitive jobs.
Optimistic time means the shortest possible time if everything goes well.
CPM is used for repetitive jobs.
Pessimistic time means the longest possible time an activity may take.
So,
A – I, B – III, C – II, D – IV
Online Test Series, Information About Examination,
Syllabus, Notification
and More.
Online Test Series, Information About Examination,
Syllabus, Notification
and More.