A
and B can complete a work in 15 days. B and C can complete the same work in 20
days. If A, B and C together can finish it in 10 days, then A and C can
complete the same work in____days.
Previous 10 Questions — DU MCA 2020
Nearest firstNext 10 Questions — DU MCA 2020
Ascending by ID
1
2
3
4
5
6
7
8
9
10
If 2x = (1024)1/5, what is the value of x ?
Topic: DU MCA 2020
Two trains each 500 metres long, are running in opposite directions on
parallel tracks. If their speeds are 50 km/hr an…
Topic: DU MCA 2020
The
speed of a boat in still water is 12 km/hr and the rate of current is 3 km/hr.
The distance travelled downstream in…
Topic: DU MCA 2020
Which
one of the following is in built data structure of C language?
Topic: DU MCA 2020
Which
of the following operators in C language has right to left associativity:
Topic: DU MCA 2020
The
following in C language is valid Variable
= expression l ? expression 2: expression 3 It represents a (an)
Topic: DU MCA 2020
Which
one of the following is incorrect in C language?
Topic: DU MCA 2020
Question
Topic: DU MCA 2020
Question
Topic: DU MCA 2020
Question
Topic: DU MCA 2020